Keeping at it This article was published on 01.14.16 Notwithstanding cold temperatures, workers are all over the surface of the new Virginia Street Bridge. The arch design is patterned after the iron arches of the 1877 bridge, foundation remnants of which were found during this construction. The new bridge is supposed to be open May 1.PHOTO/DENNIS MYERS More Local Stories » News Pic Family affair Renoites try to stop a deportation. Published on 01.07.16 School’s out Pine Middle School hit by flood from burst pipe. Published on 12.31.15 Upkeep The Woolworth building gets some work. Published on 12.24.15 On the edge Gazing out the window pays off. Published on 12.17.15 Lights A Hanukkah celebrate was held downtown. Published on 12.10.15